- 27 lakhs from TEQIP-II (Technical Education Quality Improvement Program), a World Bank scheme for establishment of phase-2 of SCADA for distribution automation laboratory for PG studies and Research activities (2012-14) (PI)
- 0.40 lakhs from VGST Technology Related Innovative Project (TRIP) for the project “Conical Collector Solar Water Heater for Rural Application”, 2012 [Ref.: No.VGST/TRIP/2012-13/242 dtd. 22.12.2012]
- 40 lakhs KFIST grant under K-FIST Level-II from Vision Group on Science and Technology, Dept of IT, BT & ST, Govt of Karnataka, Bangalore for establishing Renewable Energy (2010-11) and SCADA for distribution automation (2011-12) Laboratories to support PG studies. [Ref.: No.VGST/P-15/K-FIST/ Level-2/2010-11/753, dated 21.03.2011] (PI)
- 16.60 lakhs research grant from All India Council for Technical Education, New Delhi for the project titled “Development of FPGA-DSP based controller for three level Inverter for Grid Connection of Wind Turbine Generators”. 2008-09. (PI) [Ref.: F.No:8023/BOR/RID/rps-67/2007-08 dtd.05.03.2008]
- 8.00 lakhs research grant from Technical Education Quality Improvement Program (TEQIP), a World Bank scheme for development of Wind Data Logger using Wireless Transmission. 2006-07
- 0.20 lakhs project development grant from Technical Education Quality Improvement Program (TEQIP), a World Bank scheme for development of a new type solar water heater – “Conical Collector Solar Water Heater” – 2005-06.
- 0.255 lakhs project development grant from Karnataka State Council for Science and Technology (KSCST), IISc. Bangalore for:
- (i) 0.04 lakhs Maximum Power Point Tracking system using Boost Converter. 2006 [Ref.: 7.1.03/SPP/S&E/965 dtd.19.02.2007]
- (ii) 0.04 lakhs Microcontroller based DC Energy Meter. 2006 [Ref.: 7.1.03/SPP/B&S/08 dtd.15.02.2006]
- (iii) 0.05 lakhs Conical Collector Solar Water Heater. 2006 [Ref.: 7.1.03/SPP/B&S/08 dtd.15.02.2006]
- (vi) 0.055 lakhs Monitoring of Wind Velocity using Wireless Transmitter Module. 2006 [Ref.: 7.1.03/SPP/B&S/08 dtd.15.02.2006]
- (v) 0.07 lakhs MPPT Microcontroller based Solar Tracking System. 2006 [Ref.: 7.1.03/SPP/B&S/08 dtd.15.02.2006]
- 10.00 lakhs grant from Ministry of New and Renewable Energy Sources, Govt. of India, New Delhi through KREDL Bangalore to set up “District Level Renewable Energy Park” at BEC Campus – 2005. KRED/07/EnergyPark/2005/2234 dtd.2.12.2005 Financial Sanction: IFD/San/106/512/2005-06 dt.31.10.2005
Click on the links to find out more